Task #110

open
SG SG

Weekly GP Dashboard: rebuild as Frappe Page (local, FTWZ data)

Task #110: Weekly GP Dashboard: rebuild as Frappe Page (local, FTWZ data)

Added by Srishti Ghosh 14 days ago. Updated 8 days ago.

Status:
New
Priority:
Normal
Assignee:
Target version:
-
Start date:
10/07/2026
Due date:
10/09/2026 (13 days late)
% Done:

100%

Estimated time:
(Total: 0:00 h)
Spent time:
(Total: 10:15 h)

Description

Goal

Rebuild the SLCPL Weekly GP Dashboard as a native Frappe Page inside ERPNext (desk), in the custom app slcpl_erpnext_app. As agreed with my manager, it is built and tested locally only, on the local bench using the FTWZ (SLFPL) data.

Background

  • The dashboard currently lives as a Web Page on the SLCPL data-migration site (/gp-dashboard), using two Server Scripts: get_gp_dashboard_data (GP-locked projects: RR date, gross margin, branch, project type) and check_gp_dashboard_access (role "33-Weekly GP report").
  • On 07/10 the Web Page was upgraded (filters, charts, reports, tabs, headline strip, target colours, visual refresh, role check on the data script). This rebuild moves that design into ERPNext as a proper Page.

Local environment

  • Bench: ~/slfpl-prodn · Site: slfpl.local (http://localhost:8000) · Frappe 15.103.2 / ERPNext 15.102.0 · developer mode on
  • App: slcpl_erpnext_app (module: Slcpl Erpnext App) · work on a separate Git branch
  • Data: FTWZ projects (5,363 GP-locked, RR dates Apr–Aug 2026; branches Sricity-FTWZ, Tada, Panvel-FTWZ, Khurja-FTWZ). SLCPL targets don't match these branches, so test targets will be used for checking.

Scope

  • Page weekly-gp-dashboard at /app/weekly-gp-dashboard, access restricted to the "33-Weekly GP report" role
  • Python data function in the app (replaces the Server Scripts locally), with the same role check
  • Headline strip: this week's GP, FY-to-date % of target, leading branch
  • Tabs:
    • Overview: this-week summary boxes + the original weekly GP table (week → branch → project type drill-down)
    • Targets: cumulative GP vs target chart, branch target progress
    • Branches: GP by branch coloured by target status, weekly GP trend
    • Project types: GP by project type, Mumbai groups vs target
    • Reports: GP by branch / project type per week or month, CSV download, link to projects
  • Filters: date range, branch, project type, week/month, quick ranges
  • FY weeks, targets and Mumbai groups kept in one place

Out of scope (for now)

  • Deployment to Frappe Cloud (needs the real app repo)
  • Settings screen to edit targets without code
  • Retiring the existing Web Page / Server Scripts

Subtasks

  1. Web Page dashboard upgrade (07/10, done)
  2. Frappe Page planning & local setup review (08/10, done)
  3. Prepare local setup
  4. Create the Frappe Page
  5. Data function + targets
  6. Build the dashboard screen
  7. Testing
  8. Wrap-up

Subtasks 8 (8 open — 0 closed)

Task #111: Web Page dashboard upgrade (07/10)NewSrishti Ghosh10/07/202610/07/2026

Actions
Task #112: Frappe Page planning & local setup review (08/10)NewSrishti Ghosh10/08/202610/08/2026

Actions
Task #113: Prepare local setupNewSrishti Ghosh10/08/202610/09/2026

Actions
Task #114: Create the Frappe PageNewSrishti Ghosh10/08/202610/09/2026

Actions
Task #115: Data function + targetsNewSrishti Ghosh10/08/202610/09/2026

Actions
Task #116: Build the dashboard screenNewSrishti Ghosh10/08/202610/09/2026

Actions
Task #117: TestingNewSrishti Ghosh10/09/202610/09/2026

Actions
Task #118: Wrap-upNewSrishti Ghosh10/09/202610/09/2026

Actions
Actions