Actions
Task #110
open
SG
SG
Weekly GP Dashboard: rebuild as Frappe Page (local, FTWZ data)
Task #110:
Weekly GP Dashboard: rebuild as Frappe Page (local, FTWZ data)
Start date:
10/07/2026
Due date:
10/09/2026 (13 days late)
% Done:
100%
Estimated time:
(Total: 0:00 h)
Spent time:
(Total: 10:15 h)
Description
Goal¶
Rebuild the SLCPL Weekly GP Dashboard as a native Frappe Page inside ERPNext (desk), in the custom app slcpl_erpnext_app. As agreed with my manager, it is built and tested locally only, on the local bench using the FTWZ (SLFPL) data.
Background¶
- The dashboard currently lives as a Web Page on the SLCPL data-migration site (
/gp-dashboard), using two Server Scripts:get_gp_dashboard_data(GP-locked projects: RR date, gross margin, branch, project type) andcheck_gp_dashboard_access(role "33-Weekly GP report"). - On 07/10 the Web Page was upgraded (filters, charts, reports, tabs, headline strip, target colours, visual refresh, role check on the data script). This rebuild moves that design into ERPNext as a proper Page.
Local environment¶
- Bench:
~/slfpl-prodn· Site:slfpl.local(http://localhost:8000) · Frappe 15.103.2 / ERPNext 15.102.0 · developer mode on - App:
slcpl_erpnext_app(module: Slcpl Erpnext App) · work on a separate Git branch - Data: FTWZ projects (5,363 GP-locked, RR dates Apr–Aug 2026; branches Sricity-FTWZ, Tada, Panvel-FTWZ, Khurja-FTWZ). SLCPL targets don't match these branches, so test targets will be used for checking.
Scope¶
- Page
weekly-gp-dashboardat/app/weekly-gp-dashboard, access restricted to the "33-Weekly GP report" role - Python data function in the app (replaces the Server Scripts locally), with the same role check
- Headline strip: this week's GP, FY-to-date % of target, leading branch
-
Tabs:
- Overview: this-week summary boxes + the original weekly GP table (week → branch → project type drill-down)
- Targets: cumulative GP vs target chart, branch target progress
- Branches: GP by branch coloured by target status, weekly GP trend
- Project types: GP by project type, Mumbai groups vs target
- Reports: GP by branch / project type per week or month, CSV download, link to projects
- Filters: date range, branch, project type, week/month, quick ranges
- FY weeks, targets and Mumbai groups kept in one place
Out of scope (for now)¶
- Deployment to Frappe Cloud (needs the real app repo)
- Settings screen to edit targets without code
- Retiring the existing Web Page / Server Scripts
Subtasks¶
- Web Page dashboard upgrade (07/10, done)
- Frappe Page planning & local setup review (08/10, done)
- Prepare local setup
- Create the Frappe Page
- Data function + targets
- Build the dashboard screen
- Testing
- Wrap-up
SG Updated by Srishti Ghosh 14 days ago
- Subtask #111 added
SG Updated by Srishti Ghosh 14 days ago
- Subtask #112 added
SG Updated by Srishti Ghosh 14 days ago
- Subtask #113 added
SG Updated by Srishti Ghosh 14 days ago
- Subtask #114 added
SG Updated by Srishti Ghosh 14 days ago
- Subtask #115 added
SG Updated by Srishti Ghosh 14 days ago
- Subtask #116 added
SG Updated by Srishti Ghosh 14 days ago
- Subtask #117 added
SG Updated by Srishti Ghosh 14 days ago
- Subtask #118 added
SG Updated by Srishti Ghosh 8 days ago
- Project changed from Product Development to SLCPL ERPNext