Actions
Task #111
open
SG
SG
Task #110: Weekly GP Dashboard: rebuild as Frappe Page (local, FTWZ data)
Web Page dashboard upgrade (07/10)
Task #111:
Web Page dashboard upgrade (07/10)
Description
Work done on the existing Weekly GP Web Page (/gp-dashboard, SLCPL data-migration site) before the Frappe Page rebuild.
- Added filters, summary cards, charts and a branch report below the original weekly table
- Restored the original table after the first version replaced it; kept its drill-down (week → branch → project type) unchanged
- Charts use the FY week numbers and targets from the original script (shared via
window.GP_DASHBOARD_CONFIG) - Visual refresh: card layout, spacing, fonts, chart styling (table + new section styled as one design)
- Reorganised into tabs: Overview / Targets / Branches / Project types / Reports
- Added headline strip, this-week boxes, target-status colours on branch bars, branch and Mumbai-group target progress, project type report with CSV
- Security:
get_gp_dashboard_dataserver script now checks the "33-Weekly GP report" role - Each change previewed locally with sample data before being pasted into the site
Actions