Task #110: Weekly GP Dashboard: rebuild as Frappe Page (local, FTWZ data)

Frappe Page planning & local setup review (08/10)

Task #112: Frappe Page planning & local setup review (08/10)

Added by Srishti Ghosh 14 days ago. Updated 8 days ago.

Status:
New
Priority:
Normal
Assignee:
Target version:
-
Start date:
10/08/2026
Due date:
10/08/2026 (14 days late)
% Done:

100%

Estimated time:
Spent time:

Description

  • Compared Web Page vs Frappe Page vs Dashboard doctype; manager chose Frappe Page, built locally only
  • Reviewed local bench ~/slfpl-prodn / site slfpl.local: Frappe 15.103.2, developer mode on, slcpl_erpnext_app installed (ZIP copy, no Git remote)
  • Checked local data: Project fields used by the dashboard exist; 5,363 GP-locked FTWZ projects (Apr–Aug 2026); no GP server scripts or GP role locally; server scripts not enabled
  • Compared SLCPL site apps with the local bench (compatible; erpnext_org_structure missing locally)
  • Clarified data choice with manager: use FTWZ data
  • Wrote the step-by-step build plan (subtasks below)